Guide · updated 2026-10-18

RFQ bid comparison example: a filled-in worksheet

Fictional exampleEvery company, supplier, price and date on this page is made up for illustration. Don't paste real supplier quotes, pricing under NDA or any export-controlled data into an AI tool; anonymize first and follow your company's AI policy.

Comparing quotes is where an RFQ is won or lost. The sticker price is rarely the whole story: tooling, freight, minimum order quantities and the "exceptions" a supplier quietly adds can flip the result. Below is a complete, filled-in comparison for a simple buy, so you can see the layout, the math and the questions before you build your own.

The scenario

Example Outdoor Gear Co. (fictional) ships online orders in a printed corrugated carton. The buyer sent an RFQ to three suppliers for:

  • Item: regular slotted carton, 18 × 12 × 10 in, 32 ECT, 2-color print
  • Annual volume: 120,000 cartons (about 10,000 a month), forecast, not a commitment
  • Required lead time: 10 business days or less
  • Requested terms: Net 45, delivered price or freight quoted separately, price held 12 months

Step 1: The quotes as received

Supplier ASupplier BSupplier C
Unit price$0.82$0.78$0.85
Freight$0.06 / unitIncluded (delivered)$0.04 / unit
One-time tooling (print plates, die)$450$1,200$0 (waived)
Lead time10 business days15 business days5 business days
Minimum order (MOQ)5,00010,0002,500
Payment termsNet 30Net 45Net 30
Exceptions takenPrice adjusts quarterly to a board-price indexRequires a 12-month blanket order for 120,000Quoted 1-color print only

Step 2: Normalize to a year-one landed cost

Put every quote on the same basis: (unit price + freight) × annual volume + one-time tooling. Then add the cost of carrying the stock each MOQ forces you to hold. This example uses an assumed 25% annual carrying rate on average cycle stock (MOQ ÷ 2); use your own finance number.

Supplier ASupplier BSupplier C
Landed unit cost$0.88$0.78$0.89
Annual parts + freight (× 120,000)$105,600$93,600$106,800
+ Tooling$450$1,200$0
+ Carrying cost of cycle stock$550 (2,500 × $0.88 × 25%)$975 (5,000 × $0.78 × 25%)$278 (1,250 × $0.89 × 25%)
Year-one total$106,600$95,775$107,078

On cost alone, Supplier B is about $10,800 a year below A. But B misses the 10-day lead time and wants a 12-month commitment the RFQ didn't offer, and C didn't quote the spec at all.

Step 3: Score what the price doesn't show

Weights add up to 100 and were set before the bids came in. Scores run 1 (poor) to 5 (best).

Criterion (weight)Supplier ASupplier BSupplier C
Year-one cost (40)353
Lead time vs. 10-day need (20)435
Meets spec (20)54 (sample not yet approved)2 (1-color only)
Terms and flexibility (20)42 (12-month lock-in)4
Weighted score (out of 5)3.83.83.4

A and B tie. That's useful: the decision now turns on two answers you can get with one email each, not on a gut call.

Step 4: Gaps and clarification questions

  • Supplier A: Which index, how often, and is there a cap? Will you hold the price for 6 months before the first adjustment? Can you match Net 45?
  • Supplier B: What is the price without the 12-month blanket order? Can you meet a 10-business-day lead time if we share a rolling forecast? When can we approve a sample?
  • Supplier C: Please quote the 2-color print in the RFQ. Does the $0.85 or the tooling waiver change?

Step 5: The one-paragraph recommendation

Recommendation (draft): Hold the award until two answers are in. Supplier B is lowest on year-one cost ($95,775 vs. $106,600 for A) but needs a 12-month commitment and misses our 10-day lead time. If B drops the commitment and meets 10 days, award to B. If not, award to A, and negotiate a 6-month price hold before index adjustments. Supplier C is out unless it quotes the 2-color spec. Assumptions: 120,000 cartons a year, 25% carrying rate.

Do it with AI in 5 minutes

Paste anonymized quotes (Supplier A, B, C) into your approved AI assistant with this prompt:

You are a senior buyer. Below are our RFQ requirements and three anonymized supplier quotes.
Requirements: [ITEM, ANNUAL VOLUME, REQUIRED LEAD TIME, REQUESTED TERMS]
Quotes (one row per supplier: unit price, freight, one-time tooling, lead time, MOQ, payment terms, exceptions taken): [PASTE TABLE]
Carrying-cost rate: [X% per year]
1) Build a year-one landed cost per supplier: (unit price + freight) x annual volume + tooling + carrying cost of average cycle stock (MOQ / 2 x landed unit cost x carrying rate). Show your math.
2) Score each supplier 1-5 on cost, lead time vs. requirement, meets spec, and terms, using these weights: [WEIGHTS ADDING TO 100]. Show the weighted total.
3) List every gap or exception per supplier and write one clarification question for each.
4) Draft a 4-sentence recommendation that names what would change the decision.
List any missing or inconsistent data instead of guessing. Use tables for steps 1 and 2. Keep the answer under 350 words.

Want the full RFQ Comparison Kit?

We're considering a full RFQ Comparison Kit: a spreadsheet that does this math for you, scoring guides, clarification-question templates and more worked examples. It isn't built yet. If you'd use it, email us to get notified at launch (one email when it ships; we won't add you to anything else). We'll build it only if enough people ask.

Related: the RFQ and sourcing events use case (with real company examples), AI prompts for freight RFQs, and the free 8-prompt sample, which includes the Bid comparison and gap finder prompt.